Abstract
This research addresses a batch scheduling model for a single-machine under a Just-In-Time (JIT) production system that produces discrete parts. The objective is to minimize the total actual flow time, defined as the time when parts are flowing on the shop floor from its arrival time to their common delivery time. The decision variables are the number of batches, integer batch sizes, and the sequence of the resulting batches. The problem is solved based on the Lagrange Relaxation method. The optimality test of the proposed algorithm is done by comparing the result of the proposed algorithm with the Integer Composition method. The result of numerical experiments demonstrates that the proposed algorithm is very efficient to solve the problems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.