Abstract

The insulation recovery time after arc interruption must be known in order to select an adequate reclosing dead time of rapid auto-reclosing on transmission lines. The flashover probability of the insulation recovery voltage obtained from the insulation recovery tests using full size insulator assemblies was calculated. The insulation recovery time at the fault point for rapid auto-reclosing on UHV (1000 kV class) transmission lines was estimated.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">&gt;</ETX>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.