Abstract

In mixed/Syphon connections, the cable system as a whole can be subjected to fast-front overvoltages due to lightning strikes, either directly on the phase conductors or on the shield wires of the overhead line(s) connected to the cable. In this paper, a methodology is presented that facilitates the calculation of the failure rate performance of a cable's sheath bonding system due to lightning strikes on the connected overhead line(s).

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call