Abstract

The indirect, unplanned use of urban wastewater by peri-urban farmers in developing countries poses a severe risk to the environment and the farmers. Planned water reuse could contribute substantially to the irrigation water demand in peri-urban agriculture and minimize the risk. However, implementing such practice requires a thorough evaluation of stakeholder's perception and the scope within the existing organizational structures. This paper aims to assess the level of awareness, perception, and willingness of different stakeholders toward current practices and the prospect of urban water reuse in Khulna City - one of the most vulnerable cities located in the southwest of Bangladesh due to the consequences of rapid climate changes in the Bengal delta. Also, institutional arrangements and their functioning were analyzed to understand the current sectoral performance. One questionnaire with 385 respondents from the urban area, 32 in-depth interviews and one focus group discussion with farmers in the peri-urban area, and ten interviews with key informants from the government and non-government organization was conducted. Results indicate an overall positive attitude among major stakeholder groups toward planned water reuse for peri-urban agriculture. More than half of the citizens (53%) are willing to pay for the treatment of wastewater and majority of the farmers (66%) are willing to pay for the supply of better-quality irrigation water. However, the public sector responsible for wastewater collection and treatment requires adjustment in rules and regulations to implement planned water reuse. Interrelated factors such as lack of transparency and coordination, shifting responsibilities to other organizations, lack of required resources need to be addressed in the updated rules and regulations. Strategies to enforce current regulations and align all stakeholders are also crucial for collection and treatment of wastewater and its subsequent use for crop production.

Highlights

  • This paper aims to study the perception of major stakeholder groups towards urban water reuse, through a questionnaire survey, interviews, and analysis of the existing governance structure

  • Local agencies like Khulna Water Supply and Sewerage Authority (KWASA), Khulna City Corporation (KCC), Department of Public Health Engineering (DPHE), LGED, and Bangladesh Water Development Board (BWDB) are responsible for implementing water management projects

  • The peri-urban farmers of Khulna are heavily dependent on surface water for irrigation during the dry period

Read more

Summary

Introduction

The demand for good quality water in food production and industrial activities is proliferating in Bangladesh. Peri-urban farmers are left with no other alternative than to use this polluted surface water; a practice termed as indirect-unplanned wastewater use (Drechsel et al, 2015; Jimenez and Asano, 2008). The reasons behind this practice are lack of quality irrigation sources, unavailability of adequate wastewater management infrastructure, inadequate financial resources, absence of adequate policy, lack of farmer’s awareness and willingness to use un­ treated wastewater (Ensink et al, 2002)

Objectives
Methods
Results
Conclusion
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call