Abstract

This article describes the installation of three 375-kWe natural-gas-powered distributed generation units at Medway Plastics Corporationlocated in Long Beach, California. In addition to electric power, Medwayhas elected to utilize heat available in the engine jacket water to drive a151-ton, single-effect, vapor absorption chiller, which Medway will usefor cooling operations attendant to the injection molding process. As thisarticle was being written, the units were scheduled to undergo exhaustgas emission testing to verify compliance with regulations set forth bySouth Coast Air Quality Management District.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call