Abstract

Taiwan Photon Source (TPS), a new 3 GeV synchrotron ring, is under construction at National Synchrotron Radiation Research Center (NSRRC). To discover problems of design, manufacture and installation, a mockup of 1/24 section (one cell) of TPS was installed at NSRRC. A modified, precise, six-axis, prototype girder system of this mockup composed of three girders was fabricated. We discuss both the installation of the girder system and its diagnostics, and present the results including measurement of the dimensions of the components of the girder system and the vibration tests.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.