Abstract
In the frame of the EU program on the ITER electron cyclotron wave (ECW) system, the development of a 170 GHz, 2 MW CW coaxial gyrotron with depressed collector (C-GT170) has been launched during the Sixth Framework Program (2003–2006) in the European Technology Workplan. Such development relies on the availability of a test facility (TF) capable of providing both the energy sources and sinks required by this new electron tube (electrical energy, cooling capacity), and allowing the control and acquisition of a large range of signals used to understand and improve the gyrotron behaviour. The TF will be used, in a later stage, for the component test of the ITER ECW system. This paper will report on the design, installation and commissioning of the TF in Lausanne.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.