Abstract

Dependence on the need for electrical energy on PLN will undoubtedly require a high cost. Energy independence around the PPPI Al-Ittihad hut as a partner can minimize expenses and realize an Islamic life based on information technology and independence in energy. This problem has prompted the Malang State University community service team to install solar panels at PPPI Al-Ittihad based on smart PLTS that can be monitored in real-time. This installation serves as a source of electrical energy to meet the electricity needs of PPPI Al-Ittihad. Community service is carried out by observing, calculating load requirements, making designs, installing solar cell systems, and installing solar panel systems. The electricity generated by the smart PLTS is used for the daily needs of PPPI Al-Ittihad. Besides that, the PLTS could be the renewable energy learning media for students and IoT-based information technology. The installation of PLTS is very useful for PPPI Al-Ittihad, which has a daily power load of 4 kWh to reduce the estimated cost of electricity consumption which previously depended on PLN.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.