Abstract
Difficulties of tunnel construction mainly appear in the entrance and exit stage, some adverse geological problems may occur. In terms of the tunnel at the Changsha-Kunming section of the Shanghai-Kunming passenger line, firstly, adverse geological phenomena at tunnel exits was described. Secondly, major factors leading to disasters were listed, including geology, hydrology and construction procedure. Combined with in-situ conditions, Finite Element Method (FEM) was used to analyze the instability mechanism of surrounding rock after the upper arch gate was excavated by three-bench seven-step exaction method. At last, through comparison between computed result and measuring data, several basic conclusions was obtained. It can make much sense to similar engineering.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.