Abstract

Input Vector Monitoring Concurrent Built-In Self Test (BIST) schemes provide the capability to perform testing while the Circuit Under Test (CUT) operates normally, by exploiting vectors that appear at the inputs of the CUT during its normal operation. In this paper a novel input vector monitoring concurrent BIST scheme is presented, that reduces considerably the imposed hardware overhead compared to previously proposed schemes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.