Abstract

In the article the authors study the design of construction processes. The first part describes that the design with the solution of a number of organizational and technological problems. One of these problems is to determine the reliability of not only the construction teams, but the transport and technological flow and in accordance with the planned parameters. The authors suggest not only to determine these indicators correctly, but also to manage them with the help of automatic intelligent integrated systems. This will allow you to reliably determine and adjust the timing of work and their cost at the design stage of construction of the complex. The authors have developed an algorithm for assessing the organizational and technological reliability of related construction and mechanized processes. Mathematical calculations of mechanization of construction and installation works are given. The algorithm of integration of crews of construction transport and technological and a stream in a uniform functional cycle is given.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call