Abstract

The new type of nuclear power plant adopts once-through steam generator (OTSG) which can supply steam to the turbine, control and operation of OTSG is different from the traditional natural circulation steam generator, the control strategy of the traditional natural circulation steam generator is not applicable to OTSG. In order to meet the demand of the general operation of the integrated reactor, the operation control of OTSG is put forward. The paper proposes a double const control strategy that the average temperature of the primary circuit coolant and the secondary circuit steam pressure are kept constant, also proposesa coordinated control strategy considering reactor and turbine as a whole. The control strategy is different the traditional control method. In order to verify the control strategy, simulation experiments are carried out in a full-scale simulator system. The simulation results show that the proposed control strategy of OTSG in integrated reactor to meet the load demand, also can effectively guarantee the dynamic characteristics of pressure steam generator and related parameters of OTSG.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.