Abstract
With the increasing capacity and scale of pumped storage power plant, the maintenance management and resource input of system equipment are continuously increasing. Exploring and establishing a system engineering method that balances safe production and maintenance resource input has become an important issue that enterprises urgently need to solve. Based on the reliability-centered maintenance (RCM) technology, this paper combines the characteristics of pumped storage unit operation and maintenance management and years of maintenance practice experience to improve and innovate the RCM technology method, forming a “reliability-centered pumped storage unit maintenance strategy optimization technology method” applicable to pumped storage power generation units. This technology method has been applied on the system equipment of pumped storage power generation unit. It shows the application of this technology method has made significant contribution to optimizing equipment maintenance strategies, reducing maintenance workload and the overhaul time.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.