Abstract
AbstractFront-end planning (FEP) is a critical process for uncovering project unknowns while also developing adequate scope definition and a structured approach for the project execution process. For infrastructure projects, the FEP process assists in identifying and mitigating risks stemming from issues such as right-of-way concerns, utility adjustments, environmental hazards, logistic problems, and permitting requirements. The authors have developed a novel risk management tool, called the project definition rating index (PDRI) for infrastructure projects, which can be used to identify and address these issues systematically and in a structured manner. Input from 64 industry professionals representing over 30 organizations was used in the development of the tool. In addition to a usable definition for infrastructure in the context of the built environment, a finite and specific list of issues related to scope definition of infrastructure projects was developed with this industry input. Data from 26 comp...
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.