Abstract

Purpose – This paper aims to present the findings from research that sought to evaluate the construction industry's approach to information management at the project level and to review the operation of an information management systems (IMS) on selected projects.Design/methodology/approach – Data from three IMS used on three separate construction projects were extracted over a four‐year period as the life of the construction stage of each project came to an end. Three distinct databases of the IMS were analysed and document statistics were extracted to demonstrate the level of activity within the construction project, and between members of the construction team, using a simple counting technique for each document type.Findings – The paper finds that major construction projects generate, process and store considerable quantities of real‐time information prior to, during, and post on‐site construction. The construction activities are shrouded in information and management of the construction project requi...

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.