Abstract
According to the 20 layers reinforced concrete frame-shear wall structure building, we carried on blasting vibration monitoring in Qingdao Cross-harbor Tunnel Guide Line Project. The monitoring data of vertical vibration velocity and vertical vibration frequency had been analyzed. The results show vertical vibration velocity and vertical vibration frequency had part of intrinsic association. Vertical vibration velocity was enlarged on the top of the building. Vertical vibration frequency was in the range of 101-102 order of magnitude.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.