Abstract

In tunnel construction, blasting vibration has great influence on buildings and roads nearby. It is particularly important to discuss the influence scope of blasting vibration. This article focuses on the blasting vibration influence scope of the existing roads nearby through the blasting vibration velocity in-situ monitoring of key points with the case of blasting construction of Baohan highway project. The conclusions are as follows: the dominant frequency of blasting vibration is between 10-50Hz during the monitoring of the tunnel blasting construction, so that the existing roads nearby will not resonate with blasting. Based on the results of this in-situ monitoring, for the general blasting construction, the vertical vibration velocity should be principally monitored because it is higher than the radial and tangential vibration velocity and it is significantly destructive to the buildings. To ensure the safety of structures and transportation of the existing roads, the blasting vibration velocity of key points is supposed to be 2.0cm/s for existing roads of the shallow-buried tunnel underpass with large cross-section and soft surrounding rock. Furthermore, the data shows that the influence scope of blasting vibration wave to the existing roads is about 30m, which is consistent with theoretical calculation results. Therefore, these results can provide references to the general tunnel constructions.

Highlights

  • In recent years, with the rapid development of infrastructure construction in our country, the construction of tunnel and underground engineering has entered a large scale era of development

  • It is shown that the vertical vibration velocity is larger than the radial velocity and the tangential velocity for the surface of existing road in this tunnel blasting

  • Vertical vibration velocity should be mainly surveyed for blasting vibration monitoring in such a similar engineering situation

Read more

Summary

Introduction

With the rapid development of infrastructure construction in our country, the construction of tunnel and underground engineering has entered a large scale era of development. Built tunnel or underground engineering often needs to traverse the near existing building. The blasting excavation of newly built tunnel will affect the adjacent stratum and the architectural structure on the ground. If the setting of blasting parameters doesn’t meet the requirements, the adjacent environment will be adversely affected by blasting vibration, such as violently shaking the ground, leading to artificial earthquakes, surface buildings’. In order to ensure the safety of the construction and the personal safety of the people living near the blasting construction site, and reduce unnecessary accidental loss, it is necessary to determine the influence scope of blasting vibration

Methods
Results
Discussion
Conclusion