Abstract

Porous wind barriers (PWBs) are gradually applied to tunnel–bridge–tunnel infrastructures (TBTIs) along high-speed railway lines. Due to the remarkable aerodynamic effect of high-speed trains (HSTs), the windproof performance of a PWB at tunnel–bridge section (TBS) is particularly critical when a HST passes through the TBTI under crosswind. And it seems to be easily ignored by researchers. This study aims to determine the influence mechanism of the PWB in the TBS. A CFD dynamic model of air–train–PWB was built based on porous media theory, and its reliability is verified by model and field tests. The main results are as follows: the corresponding variation amplitudes of the train’s aerodynamic load coefficients are reduced by 36–95% when a PWB is set in the TBS; adopting the same design parameters along the full-length PWB on the TBTI is unreasonable; the PWB height and porosity in the TBS must be increased and reduced more than 33%, respectively, to achieve equivalent windproof performance. The conclusions in this paper can provide a preliminary idea for the optimization design of the PWB on the TBTI.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call