Abstract
There were examined issues of intensification of heap leaching processes and was defined promising direction of upgrading of given method of gold recovery from gold ores. There was offered use in cycle of degradation high pressure grinding rollers. There was presented description of completed tests on simulation of ore stump in these devices. Results of study demonstrated prospectivity of given method of material breakage – upgrade of gold recovery into solution was more than 5 %.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have