Abstract

Abstract This paper discusses the issues associated with the influence of underground mining operations on sewage pipelines built using the pipe jacking method. At present, to build sewage pipelines, especially in urban areas and deep embedment, trenchless technologies are employed. Mainly in these technologies, pipes are jacked into a bored tunnel using hydraulic jacks. These methods are also applied in mining areas. The aim of this paper is to analyse the influence of ground deformation, caused by mining operations, on sewage pipelines built using the pipe jacking method. The type of pipelines discussed here is built with butted sections, which cannot compensate the influences of mining operations in pipe joints if horizontal compression occurs in the near-surface layer of soil. Pipelines embedded in trenches in the mining areas are secured against the influence of mining operations with expansion joints, which compensate for ground deformation. Hence, in the analysis of the influence of soil deformation caused by mining on sewage pipelines built using jacking method, special attention was paid to the performance of pipe joints. Pipelines of the type are subjected to additional loads and displacements, caused by soil deformations like horizontal strains, horizontal soil displacements and surface curvatures. We propose a way to consider the influence of mining operations on sewage pipelines built using the pipe jacking method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.