Abstract

The shield construction process of shield tail gap caused by formation damage, the formation damage caused by the settlement is as long as the part of tunnel subsidence analysis, therefore in the finite element software analysis of shield construction settlement value, the shield tail clearance simulation is an important link in the entire model, this article analyzes three common finite element simulation method, shield tail clearance displacement convergence method based on non-uniform distribution and actual matches are higher than layer such as generation method and stiffness discount subtraction. Finally, the displacement convergence method is used to simulate the grouting effect of shield tail on the surface settlement.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call