Abstract

Summary This study investigates the effect of wellbore pressure drop on horizontal-well productivity and presents guidelines to design horizontal-well completions. The central new result of this study is a general semianalytical model that couples wellbore and reservoir hydraulics. The model enables the rigorous evaluation of horizontal-well productivity and can be used to determine optimum well length, wellbore diameter, and production rate. Field examples are presented to emphasize the consequences of the infinite-conductivity well assumption. The extension of the model to the flow of real gases is also discussed. It is shown that the pressure losses due to acceleration may play an important role in the wellbore hydraulics of horizontal gas wells and should not be ignored.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.