Abstract

Abstract This paper presents control of a multiple stages steam turbine which is switched into the island operation. The frequency in an electrical grid is stated on nominal value which is in UCTE grid 50 Hz. When deviation of frequency is higher then 0.2 Hz, the switching of particular steam units into the island operation is only the chance how to maintain the supply of, at least, some small grids. The other possibility how to keep power units in operation, to be prepared for the next synchronization to the grid, is to switch them to operation status in which they supply only their self-consumption. This change of the operating state is the most dynamic load change for the control system of the unit. The multiple stages turbines are equipped with high pressure hydraulic valves for steam turbine governing. Influence of the intercept valve on steam turbine control during the switching process into the island operation is examined in Matlab Simuling software.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call