Abstract

A two-dimensional gas-solid model has been developed for examination of the blast furnace (BF) performance under hot charge operation. Simulation conditions were obtained from the actual operation conditions of the BF with inner volume of 2500 m3 and molten iron output of 6250 ton hot metal (THM) per day. The simulation results indicate that hot charge operation could change the thermal state of the BF in the region above cohesive zone (CZ) and has little influence on the thermal state of CZ zone and the region below CZ; it could intensify both the indirect reduction of the ore and the gasification of the coke in the region above the CZ. The optimum temperature for hot charge operation is 750 K, under which, a coke rate reduction of 25 kg/THM could be obtained.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call