Abstract

The artificial freezing method has been widely used in the construction of subway tunnel connected aisle. By monitoring and analyzing the displacement of the tunnel during the construction of the freezing connected aisle, the uplift and settlement values of the tunnels on both sides are obtained. The results show that in the process of freezing and excavation, the tunnels on both sides of the connected aisle produce upward displacement; in the process of thawing after construction, the tunnel near the connected aisle produces settlement. Within six months after completion of construction, the settlement of the tunnel is about 4 mm more than that of the tunnel unaffected by the construction of the connected aisle. The engineering measures to reduce the frost heave and thaw settlement of the connected aisle are put forward, which provides a reference for similar projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.