Abstract

Simulations of electricity production are based on archived hydrological data for a water stream with an ultra-low head of 1.4 m in an area with high precipitation. Mathematical models of the equipment, designed for 1.4 m and 1.5 m heads, are constructed from the manufacturer’s data. Conditions for the safe operation of an Archimedes screw and strict limitations of water utilisation are taken into account in the simulation model of the small hydropower plant (SHP). By simulating the equipment at a baseline installation height, the benefit of prolonged operation of the SHP is also shown. The elevation of the equipment at 5 cm or 10 cm away from the baseline moderately increases production, as well. When a larger unit is placed at the proper installation height, it achieves roughly the same production as optimally designed bespoke equipment, if not more. Deploying equipment of identical size on sites with varying nominal heads avoids bespoke installations, and can significantly decrease equipment costs. A more competitive unit price of electricity is achieved, owing to the lower investment costs, and the economic viability of the SHP projects on sites with ultra-low heads is improved.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.