Abstract
Primary frequency control(PFC) of thermal power unit is an important means to ensure power supply frequency and safe and stable operation of power grid. Through the analysis and research of the PFC standard of the power grid, combined with the control structure of conventional thermal power units, it is pointed out that the delay and inertia inherent in the unit equipment have a negative impact on the PFC performance. From two directions of field dynamic test and laboratory simulation, existing problems of currently widely used control structures are clearly defined, and the technical means of reducing the influence of delay on PFC are proposed. The practical application results show that the proposed method can effectively reduce the overshoot of the PFC system and ensure that the system recovers quickly and stably.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.