Abstract
The study is aimed at estimating the influence of darkness on motorways during dry weather. In a ‘with- and-without’ impact studies, motorway traffic flow characteristics at two different locations in Malaysia were investigated. Travel speed, traffic flow and headway data were obtained continuously for six weeks at selected sites and supplemented with darkness and daylight data culled from Malaysian Metrological Department website. Start of pitch darkness time was given as 19.45 pm. The study used 22:00 pm as start of pitch darkness. Results show that maximum flow rate, optimum travel speed, critical density and optimum headway did not differ significantly. The study concluded that motorway traffic flow characteristics are not influenced by darkness significantly.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Research Journal of Applied Sciences, Engineering and Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.