Abstract
Recently high intensity rainfall disaster induces some structural failure of steel pipe open Sabo dam. To prevent such failure of the dam, a new design concept is necessary at the severe load exceeding the present design load. However, influence of debris flow impact load on steel pipe open Sabo dam is not clear to make a design load. The study experimentally approaches a vertical load distribution shape and its time history based on comparison with a wedge approach shape or a front boulder concentrated shape. The load and moment action of a front boulder concentrated shape debris flow is greater than that of a wedge approach shape. Mechanism making the difference is made clear by observation of vertical detail measurement of impact load.
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.