Abstract

When carrying out the repair and construction work in the apartment buildings and when creating an organizational and technological model, it is necessary to take into account and analyze all the parameters that influence on these works to optimize the time and financial costs. The complicating conditions of the construction works can be caused by the repair work, which are made without the relocation of the residents, the existence of the high-voltage networks, the presence of the constrained conditions, the material storage and etc. In order to give an objective assessment of the organizational and technological model of the repair and construction works, this article proposes to introduce a complex indicator of the constrained condition influence, which quantitatively reflects the influence degree of the set constraint parameter. This model gives a quantitative assessment of the influence degree of the constraint parameters and allows selecting the most effective organizational and technological model for the repair and construction works.

Highlights

  • The overhaul of apartment buildings is a complex system, which has its own characteristics in comparison with new construction

  • The existing principles for assessing organizational and technological decisions in organizing and planning the overhaul of apartment buildings do not take into account all possible parameters affecting the efficiency of repair work

  • Due to the fact that the main consumer is a resident of an apartment building, the aim of the research is to create a system in which data input and output using the potential will be intuitive for the user

Read more

Summary

Introduction

The overhaul of apartment buildings is a complex system, which has its own characteristics in comparison with new construction. Overhaul planning includes an assessment of organizational and technological solutions. The existing principles for assessing organizational and technological decisions in organizing and planning the overhaul of apartment buildings do not take into account all possible parameters affecting the efficiency of repair work. The use of the overhaul potential developed in previous studies allows taking into account the polyparametry of the object [1] in which the overhaul is planned. The method of calculating the potential helps to determine the necessary list of work on the overhaul and the priority sequence of work when planning overhaul [2]. Knowledge of the priority sequence of work allows you to choose the most effective composition of work under financial and other constraints

Objectives
Methods
Results
Full Text
Published version (Free)