Abstract

Implementing an industrial network in the construction industry can be achieved by changing construction management activities directly on the construction site within the design and operation phase. Construction logistics plays a crucial role here, in particular on the downstream side where waste has to be efficiently collected, separated, sorted and, finally, transported from site to different waste management options. The objective of this paper is to introduce an approach for efficient construction logistics that can ensure successful implementation of an industrial network in the construction industry from the point of view of on-site materials management within the logistics of disposal. Two construction projects in Germany were investigated and it was found that the total number of material streams separated directly on site in each project could be increased from 1 to 7 and from 1 to 19 different fractions. The study also revealed that the reuse and recycling rate could be increased to over 75% in both projects and the total costs of construction logistics could also be reduced. It was thus possible to increase material resource efficiency on the downstream side for both construction projects – by 43% in project I and by 68% in project II.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.