Abstract

—Obtaining the optimal power purchase agreements (PPA) in deregulated generation expansion planning is crucial. A lower PPA provided by the utility results in the independent power producer (IPP) becoming disinterested in investment. On the other hand, a higher PPA increases the government's financial burden. Therefore, this study proposes a generation expansion planning model that considers the deregulated market and PPA determination. A game theory based on a mixed strategy method and bi-level model is used in this research. To obtain the PPA optimum value, a multi-scenario analysis is conducted by changing the PPAs from 25% to 100% of the generation cost. The proposed model is applied to the Bangka Belitung power system. The results of the multi-scenario analysis show that the optimum PPA is 30% of Bangka Belitung's generation cost. This PPA creates an optimum generation expansion planning with a levelized electricity cost of 6.009 cents USD/kWh. However, the utility cannot offer a PPA of less than 30% of the generation cost because the private sector is not interested in investing. Therefore, it forces the utility to rent diesel power plants and increases the LCOE to 8.629 cents USD/kWh.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.