Abstract
Abstract: In a construction project, time overrun occurs when the work specified in the contract is not executed within the specified time frame and when the entire project cost exceeds for whatever causes, this is referred to as cost overrun. This study aim to analyze these factors that cause above delays in construction projects. A total 47 such factors were identified and classified into 8 segments, which are then indexing by using the method Relative Importance Index (RII).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal for Research in Applied Science and Engineering Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.