Abstract

Our object of study is a new class of controlled stochastic systems called generalised branching bandits which include discounted branching bandits and generalised bandit problems as special cases. These models allow us to study queueing scheduling and project scheduling problems in which the reward earned from processing a particular job is influenced by other job types present in the system. Our mode of analysis is the achievable region approach. What is novel here is that the full system may be partitioned into two subsystems, each of which satisfies its own set of conservation laws and has its own highly structured performance space. An optimal policy for the full system is constructed from two sets of Gittins indices derived from the conservation laws governing the two subsystems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.