Abstract
This paper presents a novel mixed-integer second-order cone programming model to increase the photovoltaic (PV) hosting capacity and optimize the operation of distribution systems. The operational problem considers voltage control through the optimal operation of capacitors banks, substations' on-load tap changers, voltage regulators, and network reconfiguration with radial and closed-loop operation. The proposed formulation considers voltage-dependent models for loads and capacitor banks. The objective function maximizes the PV hosting capacity of the system. Numerical experiments are carried out using the 33-node system and results demonstrate the effectiveness of the proposed formulation to increase the penetration of PV sources, especially when the closed-loop operation is allowed, together with network reconfiguration.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.