Abstract

The thesis deals with the increase of production productivity using industrial engineering methods. Application of lean methods in production process and logistics. (predicate should be added). In the theoretical part of this thesis the knowledge (information in this case is better) drawn from technical literature in the field of industrial engineering is presented. In particular the problem of balancing the production line is described here. The right production cycle is a basic requirement for serial production. Process analysis and the right detail analysis of production operations is the main indicator for batching of the production cycle and the detection of bottlenecks. In the analytical part, an approach to resolving changes on the production line is described. Time analysis of layout changes and decision analysis are described. Narrow spots have been removed by various principles. There has been a change in the layout of the production line and the application of new technology in the control room. The entire study shows the practical verification of the acquired knowledge in the field of industrial engineering and subsequent application in real operation. The project was built on the REFA methodology that was important for balancing manufacturing operations. In order to achieve the optimum production cycle, the layout had to be changed. The new layout contained a decision analysis to determine the right solution. The whole study shows a systematic approach to applying the above methods.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call