Abstract

The main problems and potential safety hazards of Aibu III Hydropower Station after extended service are analyzed. In view of the serious waste of hydraulic resources and low equipment efficiency of the power station, the expansion and reconstruction scheme of hydraulic turbine generator units is proposed, and the supporting design and implementation are carried out from all aspects of power station buildings, electrical engineering, calculation monitoring system, etc., which makes full use of hydraulic resources and completely solves the potential safety hazards of the power station, It has received good social and economic benefits. For the hydropower station after technical transformation, the operator on duty can monitor and control the operation status of main electromechanical equipment such as water turbine generator units, main transformers, transmission lines, high-voltage switches, station power, intake gates, unit main valves, and auxiliary equipment of the power station on the operator workstation in the central control room of the power station.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call