Abstract

Although it is widely accepted that the construction of dams may alter fish habitats, few studies have followed the life cycles of fish and combined the environmental conditions with the ecological behaviors and habit preferences of fish during reproductive processes to assess its effects of dam construction. In this study, we call for more sophisticated and holistic assessment framework, including effectiveness of technologies intended to mitigate environmental impacts in different life stages. An assessment framework that considers the swimming ability, perception ability of water flow and environmental preference of different fish species during migration, spawning and hatching was proposed. We used the Baihetan Reservoir as an example environment to assess the impoundment effect on the habitat of a tributary upstream of the reservoir. We observed shifts in the habitats of target fish in different life stages which is dominated by reservoir operation of the Baihetan Dam. Combined with the response of fish activities to impoundment, the selection of suitable positions for artificial breeding and release projects and the outlet of the fish transportation system were recommended measures to improve the migration possibilities. Our reassessment results also demonstrated the theoretical possibility and feasibility of joint improvements in spawning and hatching periods using instream structures. Our framework provides a complete set of “assessment-solution” processes for developers and managers to address the aquatic ecological degradation caused by resource development, and its use is strongly recommended for assessments or assessments of damming effects in other regions and on other fish species.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call