Abstract

Statistical process control (SPC) is a powerful statistical tool for process monitoring that has been highly recommended in healthcare applications, including radiation therapy quality assurance (QA). The AAPM TG-218 report described the clinical implementation of SPC for Volumetric Modulated Arc Therapy (VMAT) pre-treatment verifications, pointing out the need to adjust tolerance limits based on plan complexity. However, the quantification of plan complexity and its integration into SPC remains an unresolvedchallenge. The primary aim of this study is to investigate the incorporation of plan complexity into the SPC framework for VMAT pre-treatment verifications. The study explores and evaluates various strategies for this incorporation, discussing their merits and limitations, and provides recommendations for clinicalapplication. A retrospective analysis was conducted on 309 VMAT plans from diverse anatomical sites using the PTW OCTAVIUS 4D device for QA measurements. Gamma Passing Rates (GPR) were obtained, and lower control limits were computed using both the conventional Shewhart method and three heuristic methods (scaled weighted variance, weighted standard deviations, and skewness correction) to accommodate non-normal data distributions. The 'Identify-Eliminate-Recalculate' method was employed for robust analysis. Eight complexity metrics were analyzed and two distinct strategies for incorporating plan complexity into SPC were assessed. The first strategy focused on establishing control limits for different treatment sites, while the second was based on the determination of control limits as a function of individual plan complexity. The study extensively examines the correlation between control limits and plan complexity and assesses the impact of complexity metrics on the controlprocess. The control limits established using SPC were strongly influenced by the complexity of treatment plans. In the first strategy, a clear correlation was found between control limits and average plan complexity for each site. The second approach derived control limits based on individual plan complexity metrics, enabling tailored tolerance limits. In both strategies, tolerance limits inversely correlated with plan complexity, resulting in all highly complex plans being classified as in control. In contrast, when plans were collectively analyzed without considering complexity, all the out-of-control plans were highlycomplex. Incorporating plan complexity into SPC for VMAT verifications requires meticulous and comprehensive analysis. To ensure overall process control, we advocate for stringent control and minimization of plan complexity during treatment planning, especially when control limits are adjusted based on plancomplexity.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.