Abstract

The objective of infrastructure management is to provide optimal maintenance, rehabilitation and replacement (MR&R) policies for a system of facilities over a planning horizon. While most approaches in the literature have studied the decision-making process as a finite resource allocation problem, the impact of construction activities on the road network is often not accounted for. The state-of-the-art Markov decision process (MDP)-based optimization approaches in infrastructure management, while optimal for solving budget allocation problems, become internally inconsistent upon introducing network constraints. In comparison, approximate dynamic programming (ADP) enables solving complex problem formulations by using simulation techniques and lower dimension value function approximations. In this paper, an ADP framework is proposed, wherein capacity losses due to construction activities are subjected to an agency-defined network capacity threshold. A parametric study is conducted on a stylized network configuration to infer the impact of network-based constraints on the decision-making process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.