Abstract

Production rate limits for perforated casing completions in weak rock formations are estimated for a material obeying a quadratic yield condition. Plastic stresses around a spherical cavity are calculated to determine the well pressure value which precipitates solids production. Elastic solutions for a cylindrical cavity are utilized to place upper and lower bounds on the well pressure value which initiates yielding around a perforated casing. The separate analyses define consistent critical well pressure values for initial yield and solids production as a function of rock properties and in-situ conditions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call