Abstract
Major plant construction projects represent a large part of a typical utility's rate base and construction cost overruns are a perennial problem associated with these projects. The conventional approach to prevent overruns is direct regulatory oversight by a regulatory commission. Yet this approach fails to provide on-going incentives for the most cost effective decisions by the utility. This article contrasts an incentive method of regulation, which inversely relates the rate of return granted by the regulatory agency with the level of overruns incurred, with conventional rate regulation. A discounted cash flow simulation model is employed based on data from an electric generation project currently under construction in Central New York.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of the Northeastern Agricultural Economics Council
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.