Abstract
Abstract In this paper the author describes the methods used in installing incentive payment plans on two different phases of material-handling activities at the East Pittsburgh plant of the Westinghouse Electric & Manufacturing Company. The first phase is that of industrial electric trucking, the other is a material-supply group in the motor-manufacturing department. Detailed formulas used in the installation are included.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.