Abstract

We develop multi-path reservation algorithms for inadvance scheduling of large file transfers in connection-oriented optical networks. Specifically, to schedule a single file transfer to complete at the earliest possible time, a new max-flow based greedy algorithm(GOS) and four variants that adapt the kshortest paths and k-disjoint paths algorithms are proposed. Meanwhile, to find an earliest-finishing schedule for a batch of file transfers, a linear programming based algorithm(BATCH) is developed. Extensive experiments using both real world and random networks show that our GOS algorithm provides a good balance among maximum finish time, average finish time, and computational complexity. Although our BATCH algorithm results in the smallest maximum finish time, this algorithm has a significantly larger computational requirement than our other algorithms. GOS yields file transfer schedules with similar maximum finish time and reduces average finish time while having a significantly less computational requirement.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.