Abstract

Abstract A baseline strategy for dust and tritium-inventory control and recovery in ITER has been established and preparations are underway for its implementation. Limits on dust and tritium-inventory are an integral part of the ITER safety case and are fixed at 1 kg for tritium, 1000 kg for mobilisable dust and 11 kg (beryllium)/76 kg (tungsten) for dust on hot surfaces. Maximum average T-retention rates of ∼1 g/shot are estimated for baseline inductive operation at QDT = 10, suggesting that the in-vessel T-retention could reach the administrative limit of 640 g in as little as ∼2 months of operation. Baking is expected to remove a significant fraction of the T co-deposited on the divertor targets. Despite large uncertainties, dust quantities are expected to remain well below safety limits over the divertor cassette lifetime. In situ aspiration during divertor cassette exchange is foreseen as the main dust removal technique.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.