Abstract

This paper discusses the design and application of in-situ particulate sampling systems in evaluating the performance of high-temperature, high-pressure (HTHP) gas-filtration systems at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. Initial operating experience with the sampling systems is reviewed, and results of initial sampling runs are discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call