Abstract

Two new irradiation projects are being performed at the HFR Petten, named EXOTIC-8.9 and EXOTIC-8.10. Issues such as tritium release from candidate ceramic breeder pebbles for the HCPB blanket and tritium permeation through cooling tubes of the WCLL blanket are investigated simultaneously. In EXOTIC-8.9, the tritium release behaviour of a Li 2TiO 3 pebble bed is measured along with the tritium-permeation rate through a double-wall tube (DWT) of T91 with a Cu interlayer. In EXOTIC-8.10, the tritium release behaviour of a Li 4SiO 4 pebble bed is measured along with the tritium permeation rate through a T91 tube with a Fe–Al/Al 2O 3 coating as tritium permeation barrier (TPB). Tritium permeation phenomena are studied by variations of temperatures and purge gas conditions. This paper reports on the results of the first 100 irradiation days.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call