Abstract

<p>Pharmaceutical industry especially that move in generic products, have many kinds of products to be manufactured in its production lines with the shortest possible time. This condition causes the frequent of changeover process. This cause requires the company to further improve the effectiveness of the machine by reducing the time of changeover process in terms of setup and clean-up machine. In order to reducing the time of setup and clean-up activity use the method of approaches the SMED analysis method to reduce unnecessary motion waste (value added and non-value added derived from lean manufacturing). Before conduct the research, in the 5th production line was not in the Kanban system. So, it often occurs the changeover process. The longest changeover time is in the drying room. After that conduct the Time and Motion Study in order to know the detail setup activities in the drying room. This is due to problems in the working methods and environment factors. Based on data from observations made on the engine FBD, there are 49 activities comprising 44 internal activities and 5 activities that can be converted to an external. Then from 44 internal activities, only 43 were able to be combined activity of up to 11 activities. Results from this study is able to decrease setup time and clean-up on the machine FBD by 62.18%. Based on this result also, this can increase the productivity of the production line.<br />Keywords: Unnecessary motion waste, Lean Manufacturing, Value added, Non-value added, Changeover process, SMED.</p>

Highlights

  • IntroductionThe vision is to be a sustainable leading company in budgeted therapy segment enable by agility, innovation, and operational excellence and the mission is to build a healthier society through economical quality health products

  • The improvement using Single-Minute Exchange of Die (SMED) analysis can accelerate the time in order to conduct the set up and clean-up activities until 62.18%

  • Based on the Ishikawa Diagram, there are some problem in the method factor and environment factor

Read more

Summary

Introduction

The vision is to be a sustainable leading company in budgeted therapy segment enable by agility, innovation, and operational excellence and the mission is to build a healthier society through economical quality health products. Because of produced the generic product, this product very needed by the people. This company must be able to fulfil the market’s demand. In order to fulfil the demand, the company must be improved to become more productive. There are some factors that influence the company productivity: machine condition, setup time, processing time, and etc. Setup time and processing time are very influence to the cycle time in production process. In order to become more productive, the company must decrease the setup and processing time. The company can fulfil the market’s demand in generics pharmaceutical

Methods
Findings
Discussion
Conclusion