Abstract
This article describes the blow-in of a large blast furnace with the use of sinter prepared especially for this purpose. It is shown that use of the “blow-in” sinter makes operation of the furnace more reliable during the blow-in period which follows an overhaul and reduces the time required to restore the furnace to its normal operating regime while also minimizing fuel consumption.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.