Abstract

This letter proposes a formulation of the corrective security-constrained optimal power-flow problem imposing, in addition to the classical post-contingency constraints, existence and viability constraints on the short-term equilibrium reached just after contingency. The rationale for doing so is discussed and supported by two examples

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call